Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

DRAFT - Attila has suggested that we created a checklist of steps for MQ to help them be self-sufficient. The following is a draft list that needs to be add-to and/or modified to be a complete set of steps and accurate. 

The following steps outline the process for registering your system, completing the test cases, submitting your results and receiving your testing report.

...

  • you are logged in, please ensure that you are operating in the Pan-Canadian Conformance 2024 testing session. If you are not, please switch your session using the Switch button, located in the Title Bar.
    •  Refer to the Gazelle Self-Testing Guide for details about how to execute the test cases.
  •  Upon testing completion, collect the list of successful test cases and submit them for verification to Infoway, providing a contact email with test case links.
  •  Infoway will verify successful completion and issue a conformance test report for your system listing all tested profiles and the results. The report will be emailed to the email account you identified as your contact.
  •  You may present the conformance test report to your jurisdictional team.

Test Data

The following table provides the clinical data sets for testing the PS-CA. (Note that the current data sets and JSON sample file are in support of PS-CA v1.0.0 and updates for PS-CA v1.1.0 are coming soon.)

Clinical Data Sets

Description

Sample(s)

PS-CA-Clinical Data Set (Excel)

Updated on: February 9, 2023

A clinical data set that represents the required information using the correct data types and valuesets, where specific valuesets are defined as Required in the PS-CA.



TIPS:

In preparation for the 2023 Projectathon, a number of webinars were hosted. If this is your first time using Gazelle or the other tools, you may find this content helpful. Please keep in mind there will be specific references to the 2023 Projectathon that no longer apply.




Attila's original list:

...

  • Register your system in the Gazelle platform – Conformance domain (as opposed to Projectathon 2023)

...

  • Select the integration profiles you claim to support (e.g., CA:FeX, CA:Sec, CA:Aud, IUA, etc.)

...

  • Following the instructions on how to use simulators test your system’s capabilities using the No Peer test cases listed in Gazelle for your system (here we likely want to have a bit more detail)

...

  • Execute the test cases for each integration profile without worrying about log files

...

  • Validate the content of your FHIR document using the Validator configured to PS-CA v1.1.0 package

...

  • After successful completion of all of your tests (against simulators), get ready for log collection

...

  • Set up your system to execute your transactions through the Gazelle proxy

...

  • Repeat all of your test cases (for each registered integration profile) through the proxy and collect all log files. Link the log files to your executed test cases

...

  • Complete all test cases in No Peer tests, including the document validation

...

  • Collect the list of successful test cases and submit them for verification to Infoway (an email with test case links)

...

  • Infoway will very successful completion and issue a conformance test report for your system listing all tested profiles and the results.

...

  • Present this report to your jurisdictional team.