DRAFT
- Register your system in the Gazelle platform – Conformance domain (as opposed to Projectathon 2023)
- Select the integration profiles you claim to support (e.g., CA:FeX, CA:Sec, CA:Aud, IUA, etc.)
- Following the instructions on how to use simulators test your system’s capabilities using the No Peer test cases listed in Gazelle for your system (here we likely want to have a bit more detail)
- Execute the test cases for each integration profile without worrying about log files
- Validate the content of your FHIR document using the Validator configured to PS-CA v1.1.0 package
- After successful completion of all of your tests (against simulators), get ready for log collection
- Set up your system to execute your transactions through the Gazelle proxy
- Repeat all of your test cases (for each registered integration profile) through the proxy and collect all log files. Link the log files to your executed test cases
- Complete all test cases in No Peer tests, including the document validation
- Collect the list of successful test cases and submit them for verification to Infoway (an email with test case links)
- Infoway will very successful completion and issue a conformance test report for your system listing all tested profiles and the results.
- Present this report to your jurisdictional team.